Opens in a new tab
St Michaels First School Stone Open Day

Road closures on Easter Sunday for Network Rail work

Network Rail

Kings Avenue and Tunley Street will be closed on Easter Sunday as Network Rail continues its vegetation management works in the town.

A letter to residents says the closure will be in place between 8am and 5pm to allow three lime trees to be chopped back, although a sign on Kings Avenue has slightly different times (above).

The letter says: “To undertake these works we will be using chainsaws and chippers which might cause some disturbance. However, every effort is made to keep noise to a minimum and our staff are briefed on working responsibly in the local community.”

Article continues after this message
Oktoberfest Stone 2026 Poster

It adds that an ecological survey is carried out before work starts, with any protected species or nesting birds identified and “appropriate methods of working” put in place.

[box type=”info” ]If you want more information, call the Network Rail 24-hour helpline on 03457 114141[/box]

Docs Mobile Clinic

Leave the first comment

Related Posts:

  • Eccleshall Road bridge closure to continue until February

    Jon Cook | {post_date: jS F Y}

    Eccleshall Road Bridge
  • Coppice Estate to be cut off for level crossing renewal

    Jon Cook | {post_date: jS F Y}

    Church Lane level crossing in Stone with tracks and barriers, connecting to the Coppice Estate in the background.
  • Pedestrian level crossing closed due to misuse

    Jon Cook | {post_date: jS F Y}

    Stone Station
  • Replacement coaches in May as trains diverted

    Jamie Summerfield | {post_date: jS F Y}

    trains